1.SITE SURVEY
Explore the site, evaluate the installation capacity and installation methods.
Factors you should know first
Factor 1 Installation area
Factor 2 Electricity Bill
Factor 3: Electrical Connections and Protection (ELD)
Step 1-2
2.PROPOSAL
Offer preliminary installation drawings, production capacity, and available equipment and materials along with prices, as well as showing productivity and payback periods throughout the service life for customers to make decisions. investment
3.PURCHASING
Agree on prices, make contracts, purchase materials and equipment. The highest standard used for installation system according to customer requirements and agreed price
Step 3-4
4.GOVERMENTAL LIAISON SERVICE
Preparing documents and drawings for applying for government licenses required to install solar rooftop systems
5.INSTALLATION
Delivery of materials, equipment, system installation and power supply Obtained from Solar roof Top enters into the building’s electricity system for the agreed time period.
Step 5-6
6.WARRANTY MONITORING & MAINTENANCE
Test the control system, maintain and guarantee the installation and production as per the contract.
Our Customer "PAYBACK"
1.payback in a period of 4-6 years
2.Long service life up to 25 years, equivalent to being able to use for another 19-21 years after the capital has been paid.
3.Low annual maintenance costs
4.The average price of electricity from Solar Rooftop is 0.7 baht/unit for a period of 25 years.
5.The cost of the project can apply for BOI promotion at 50% of the project value.
welcome to give advice ready to offer you the best conditions
CONTACT US
- Sales Office: 6/10 Soi Pattanasin, Thungmahamek , Sa Thorn , Bangkok 10120
- Warehouse: 6/5 Moo 11, Lat Sawai, Lam Luk Ka, Pathum Thani 12150
- Tel: 063-9578814 (Admin)
- 063-8823524 (Ake)
- 063-8841949 (Korn)
- 063-8842939 (Jay)
- Email: sales@we-winnerenergy.com
- Facebook: https://www.facebook.com/wewinnerenergy
- Line: @winnerenergy